1. According to the equipment lubrication chart for oil lubrication. 2. Discharge water and impurities from the oil-water separator of the air system. And the oil into the collimator, adjust the amount of oil injection, so that the riveter in each working stroke evenly into a few drops of oil. 3. Before the work should check the equipment parts of the fixed and connection, open the air system check system pressure should not be less than 0.5 mpa pressure. Four. Before formal press riveting, should first test, check whether the normal work of the institutions. 5. According to the thickness of the rivet joint, the diameter of the rivet and the open working condition, select the press-riveting die and adjust the press-riveting machine. 6. Test the rivets, check the quality of riveting (head height, diameter and shape) and riveting parts.